/
Kit Prep Instructions
Drone Ag Limited // Operating Safety Case
Kit Prep Instructions
Electronics case
Drill holes for cabling
Take out the rubber sealing tube before drilling!
Large hole for generator using small → 14mm drill bit
pub rubber sealing tube back in after drilling
Remove 3x bottom holes to allow case to be screwed into pallet
need locks for case - coded
, multiple selections available,
Related content
Pre-Flight Procedures
Pre-Flight Procedures
More like this
Base station kit list
Base station kit list
More like this
Pre-Flight Procedures Checklist
Pre-Flight Procedures Checklist
More like this
Base Station Installation and Test Procedures
Base Station Installation and Test Procedures
More like this
Post-Flight Procedures
Post-Flight Procedures
More like this
FRC M3E 1581F5FHB229E00200KW 02/12/24
FRC M3E 1581F5FHB229E00200KW 02/12/24
More like this
Drone Ag Limited // Version 2.5.1 // 28/10/2024
© Drone Ag Limited – 2024
All rights reserved. Reproduction of this publication is not permitted by any person without the expressed permission of the Accountable Manager of Drone Ag Limited.